This store requires javascript to be enabled for some features to work correctly.

Sale
Sale

Change Order Fee

CHANGE-ORDER
Lead Time:
  • $15.00
Shipping calculated at checkout.
Aggiungi {cost} per supportare tecnologie di rimozione del carbonio rivoluzionarie.
Original Designs Historically Inspired. Uniquely Ours
Made in USA Forged by Hand in Teton Valley, Idaho
From Our Family Forge Crafted by multi-generation family blacksmiths
Veteran-Powered US Army Veteran blacksmiths—American grit in every strike.
  • Original Designs Historically Inspired. Uniquely Ours
  • Made in USA Forged by Hand in Teton Valley, Idaho
  • From Our Family Forge Crafted by multi-generation family blacksmiths
  • Veteran-Powered US Army Veteran blacksmiths—American grit in every strike.

This fee applies to all changes made to an existing order 24 hours or more after the original order was placed. This fee is cumulative and may be charged each time an order needs to be adjusted or altered after the allotted 24 hours.